Your CMMC Readiness Partner - Cleared, Credentialed, and Built for the DIB
AeoliTech serves defense primes and subs navigating CMMC Level 2 and Level 3 requirements. We are not a generalist MSP with a CMMC add-on. We are a founder-led practice built by engineers who personally built CMMC controls at MITRE and carried federal systems through full ATO at Los Alamos National Laboratory.
Who We Serve
Defense Primes with Flowing-Down Requirements
You hold a DoD prime contract. The CMMC clause is in your base agreement or your next modification. You need to certify your own environment and ensure your subs meet threshold requirements before your award expires. You do not have 18 months.
Defense Subcontractors Receiving CUI
Your prime is requiring CMMC Level 2 as a flow-down. You handle Controlled Unclassified Information in your engineering systems, collaboration platforms, email, or file storage. You need your SPRS score up, your SSP documented, and your evidence package audit-ready, without hiring a full-time compliance team.
DoD and DoE Program Contractors
You operate systems in support of DoD or DoE programs: research, development, test, logistics, or sustainment. You may have existing FISMA or RMF obligations. You need CMMC aligned with your existing compliance posture, not bolted on top of it.
What Makes This Different
Most CMMC consultancies send you a junior GRC analyst with a spreadsheet. AeoliTech sends Leonard.
Active DoD Secret + DoE Q Clearance
AeoliTech leadership can discuss your CUI environment, your system boundary, and your sensitive program context without clearance barriers.
MITRE CMMC Controls Experience
The controls we implement are the same controls built and validated inside the institution that helped develop the CMMC framework.
Full ATO Delivery at LANL
Leonard has already carried a system through the harder version, NIST 800-53 High, at Los Alamos National Laboratory.
PolicyCortex Automation
AeoliTech deploys PolicyCortex to automate evidence collection, control validation, and drift detection. This is how we compress 12-18 months to approximately eight.
The CMMC Timeline Reality
Without AeoliTech
12-18 months
Average manual readiness timeline
With AeoliTech + PolicyCortex
~8 months
Average readiness timeline
CMMC final rule effective November 2025. Phase-in underway. By November 2026, primes and subs without L2 certification face removal from award consideration.
Ready to Assess Your Current Position?
Book a CMMC Readiness Call(469) 546-5585 | cmmcnow@aeolitech.com